Nigeria-Cameroon Submarine Cable System (NCSCS)

 

Link Kribi, Cameroon with Lagos, Nigeria, with 4 Branching Units reserved for future extension

placeholder image

Highlights

  • Repeatered submarine cable system, total route length is approx. 1,100km
  • Design capacity: up to 12.8Tbit/s (80chs x 40Gbit/s x 4fp)
  • RFS : August, 2015
  • Promote cooperation between Camtel and Mainone
  • Help clients obtain financing
  • Bandwidth extending & new international connectivity for Cameroon

project length
design capacity
Get in Touch

Similar Experience