MCT: A Deep Dive into Regional Connectivity

 

placeholder image

Highlights


  • Repeatered cable system with power switchable Branch Unit, 1,300 km in total length
  • 100G technology, 30 Tbit/s design capacity
  • RFS: 2017 Q1
  • Repaetered solution audited by Axiom consulting 
  • The first subsea cable direct landing at Cambodia

project length
design capacity
Get in Touch

Similar Experience